J.Schwartz,llc Construction Blog (PAHIC#861)

PLEASE VISIT OUR NEW BLOG AT www,jschwartzconstruction.com/blog

Wednesday, March 18, 2009

What does “Green” even mean?

The term “green” is a bit amorphous and does not really have a set definition; and this causes a problem with the idea of being green (in my opinion, anyway). The Green concept is based on things like using fast-growth materials so that we are not laying the land bare, using materials that are bio and photo-degradable so that we are not filling landfills, using recycled materials (for obvious reasons), using highly efficient materials in order to save energy, use locally grown materials to reduce the carbon footprint, using adhesives and chemicals that are not bad for the environment (formaldehyde, etc), using things like solar, thermal and wind energy, using materials in new ways that would have otherwise been thrown away (engineered lumber uses scrap wood), and this list goes on and on.
The problem comes in when you take a myopic look at something and are tempted to call it “green” based on only one of the criteria listed above. For example, one of the commonly used green materials is bamboo – but as far as I have been able to tell, a huge majority of the bamboo used in the U.S. is imported and importing creates a huge carbon foot -print. Maybe this should negate this from being a green product? Well, the truth is, I do not know…because I guess it is all relative.
Together, let’s take a challenge, and do a comparison and contrast of materials / methods that are being called green… Over the next months, I will try to come up with a “green grading system” that can be used to compare and contrast materials and methods that will give an easy to read “green score” so that we can decipher what is and what is not actually green. If anyone can help with methodology for figuring out carbon footprints, that would be very helpful, and any suggestions of items to be included in the list would be great too. Keep in touch and explore this with me in the weeks and months to come…

posted by Joe Schwartz - J. Schwartz,llc at 9:01 am  

Saturday, March 14, 2009

An Opinion about the outcome of the recession as it relates to the construction industry and our potential clients.

I have a theory about what is about to happen to the residential construction industry in years to come… and I am not sure that it looks very good for awhile.
In an indistry that is highly unregulated, it is easy to throw some tools in a truck, come up with a company name, and call yourself a remodeler or home builder. Actually, it is just that easy! That being said, I think that most would agree that the large speculative home-builders will not be doing as much building for some time (if even within my lifetime); and all of those people that were working for them will have to find other things to do. I am not saying that they are not highly talented people that have very useful skills – but being a skilled tradesman is very different than being a skilled business owner, general contractor, remodeler, or construction manager. Also, all of those young people that are looking to start a career in the industry will be behind the eight ball, looking for work.
It is my fear that many of these people that do not have the skill to general-contract and do not know enough about the integration of trades and systems, client relations, scheduling, detailing, expediting, material selection, accounting, book-keeping, job site coordination, marketing, sales, etc, etc, etc, that all make for a good, quality construction business will soon flood the market with low-quality competition.
This only becomes a problem because all too often, our potential clients do not see the skill levels and training required to do the things that we do well, that they expect us to do well – and cost becomes king.
I think that because of this flood of unqualified new “businesses”, we are in for 5 or ten years of shoddy work, bad business practices, and unreasonable competition that will only sort itself out with regulation of the industry and the inevitable weed-out process that will come with businesses going under. Some of this shoddy work has benn occuring due to rushed schedules and over-eager builders, too. (See the link below this post).
So buyer beware, you get what you pay for and we have already seen a large number if businesses go under due to shoddy workmanship and bad business practices. J. Schwartz,llc has been hired on occasion to remedy some of these projects, and although the final outcome may still be beautiful, the process is tainted, usually exorbitantly more expensive and contains some litigation with the less than satisfactory contractor that had the “lower price”…
CLICK HERE TO READ AN ARTICLE ABOUT HOW SHODDY CONSTRUCTION IS IN PART RESPONSIBLE FOR THE FORECLOSURE CRISES.

posted by Joe Schwartz - J. Schwartz,llc at 8:22 pm  

Friday, March 13, 2009

Two More Awards in 2009!!!!

J. Schwartz,llc was again honored for excellence in the Home Building and Remodeling Industry by the Home Builders Association. On Friday March 6, 2009 the Association held its annual black-tie Pinnacle Awards to recognize outstanding achievement in the industry. Although the competition was some of the largest home-builders in the country, J. Schwartz,llc was awarded with TWO Pinnacle awards – One for the Best Bathroom Design by a Builder, the other for the Best Remodel. We are proud of those that helped us achieve these awards, proud of the projects and thankful to our clients.

posted by Joe Schwartz - J. Schwartz,llc at 9:19 am  

Friday, March 13, 2009

Current Events and how they affect us at J. Schwartz,llc 3/13/09

There is no denying that the current economic “down-turn” has affected everyone – no matter what kind of “smoke blowing” and stories they are telling; especially those of us in the home-building and renovation business.
J. Schwartz,llc is currently putting out a record number of proposals – and it is easy to ask why so many are looking for numbers on projects that are obviously not happening… I would guess that there are a few reasons for this: One may be that people that would have been “moving up” to a larger or new home in years past are currently looking to settle-in and renovate. Another reason may be that home-owners are thinking that they will take advantage of a weak market and get better pricing because of an assumed drop in material and labor costs.
The truth is that with this record number of outgoing proposals, few are being signed – and there may be many reasons for this, as well. Although commodities like copper and other metals have dropped in price; it does not necessarily translate into savings on the items that the home-builders need – wire, gutters, studs, etc. While it does always seem that as soon as the market has a cost increase, we all feel it; it is also true that when prices drop on the raw materials, those decreases don’t flow-through as quickly. In hand with that is that although people are very hungry for work, and there certainly is some savings to be had with the current conditions, I feel it is very important for people to understand the psychology of the situation – (Yes, you are reading a blog from a home builder that is talking about psychology). No matter what the quality level of the project (all J. Schwartz,llc projects are of the highest quality,with budget in mind), there is the right level of tradesperson or craftsman for that project; and with the right person, there is an immense amount of pride in the work that they do. If you are a smart client, you want the best workmanship at a great price – and while there is no doubt that we can currently “beat people down” to low wage rates, it does not mean that they will give us the same quality and pride in their workmanship once we do; there is a delicate balance that must be held, and that is what J. Schwartz,llc does. So in summation, my first reason for unsigned proposals is price. The assumed material decreases are not there, and the huge labor rate decrease are not either – especially if you are looking for a project that will not have problems, will be of a high quality level and be as beautiful as you dream it will be.
The second reason for unsigned proposals may be that it seems that the downturn has not yet hit bottom – and any bit of reluctance only gets excacerbated with each passing day… so it may be that these projects are not gone, they are just “on hold” until we see the sun again.
J. Schwartz,llc will be here for that, and we will be ready with the right mix of quality, energy, readiness and accessibilty for our clients.

posted by Joe Schwartz - J. Schwartz,llc at 8:57 am  

Saturday, February 28, 2009

PLEASE VISIT OUR UPDATED WEB SITE AT www.Jschwartzconstruction.com

We have added video of our “before and after” HGTV project, and have updated our featured projects area!!! CLICK HERE TO GO!

posted by Joe Schwartz - J. Schwartz,llc at 9:14 pm  

Monday, February 23, 2009

Philadelphia Residence Completed

Interior - Stair

Interior - Stair

See the March 1,2009 Philadelphia Inquirer for an article on this home!
All that was left of this delapidated center city home was the historic facade. The structure was the original home of the Philadelphia Police Horse stable (1800’s); and the front facade still had the original door openings and hardware.
The new structure was built with open-webbed trusses and the latest in engineered products to allow for seamless mechanical coordination without the usual dropped soffits while also giving the maximum interior space.
The home behind the facade is surpirisingly contemporary – with glass curtain walls, cantilevered steel and metal stairs, and an elevator serving the home and roof deck that overlooks center city, as well as a full house entertainment system.
The finishes are all just as inviting as the rest of the interior – cork flooring in the kitchen, 5″ Oak flooring in the living spaces, specialized stone backsplash in the sleek, modern kitchen and floor to ceiling stone in the custom two sided master shower.
The home also has two rear steel and composite (low maintenance) terraces and a ground level outdoor patio area.
CLICK for an article in the Philly Inquirer about this project!

posted by Joe Schwartz - J. Schwartz,llc at 8:23 am  

Friday, February 13, 2009

NEW CUSTOM ENERGY STAR HOME COMPLETED – AWARDED PINNACLE AWARD FROM THE HOME BUILDERS ASSOCIATION!

NEW ENERGY STAR RATED HOME!

NEW ENERGY STAR RATED HOME!

J. Schwartz,llc recently completed a new custom 9500 Square foot home located in Lafayette Hill and was awarded a Pinnacle Award from the Home Builders Association for the Master Bathroom in this project. The entire project took only 8 months including the tear down and total removal of the existing home! The new home is complete with 5 full and 1 half bath, with a 6th full bath ready for completion in the basement.
The stone home uses the latest in energy conserving spray insulation, windows, heating and air conditioning systems. The finishes include wide-plank Oak Flooring, full height panelling, true Craftsman style columns and trim-work, a gourmet kitchen and full in-law suite.

posted by Joe Schwartz - J. Schwartz,llc at 12:54 pm  

Friday, February 13, 2009

J. Schwartz,llc Receives CONTRACTOR OF THE YEAR Award and PINNACLE AWARD!

FRONT FACADE - AFTERJ. Schwartz,llc received the Contractor of the Year Award 2009 from the National Association of the Remodeling Industry for the entire Northeast Region of the United States and is being considered for the national award.  The winners of the National Title will be annouced at the end of March in Atlanta.

The project that we were awarded for was a full house renovation in Elwyn, PA, pictured here.

posted by Joe Schwartz - J. Schwartz,llc at 12:48 pm  

Monday, August 18, 2008

Hello world!

HELLO ALL!  This is my first construction blog, so please be patient…

Partial Front Facade

Partial Front Facade

This project entailed the total demoltion of the attic area over the garage, a new Conservatory addition on the right (14′ ceilings), a new garage bay and room over the garage, a new Three-Season room in the front with an office and master closet above and a new Portico.  We are currently about 1 month ahead of schedule!  The interior will be complete this week, the exterior painting and new driveway work will have to wait for warmer weather.  Interior photos to follow…

posted by Joe Schwartz - J. Schwartz,llc at 5:52 pm  
« Previous Page

Powered by WordPress